Blog Post

New Floor Upgrade Packages for Dash 8 Q400

Comtek • Aug 07, 2012

Floor upgrades include the forward and aft entryways, and the aft upper baggage bay.

Comtek Advanced Structures has developed several floor upgrade packages for the Bombardier Dash 8 Q400 aircraft.

The floor upgrade packages are available for the forward entry, aft entry and the aft upper baggage bay. Due to high levels of traffic and stress during regular use, the floor panels in these areas need to be replaced or repaired frequently.

Comtek developed floor panel upgrades using more robust materials such as heavy duty honeycomb core to increase stiffness and durability and a mat overlay to reduce surface wear and increase impact resistance. These upgrades will give operators an increased operational life on each of the panels by improving the reliability of the aircraft with respect to these areas. Each floor upgrade package comes with a 24 month warranty on materials and workmanship.

Learn more about Comtek's Q400 floor panels.

15 Feb, 2024
Pratt & Whitney Canada selects Comtek and parent Latecoere to design and build a major structural composite assembly
07 Dec, 2023
Congratulations to an Amazing Team for reaching this milestone!
04 Apr, 2023
Added repair capabilities for Japanese Operators
15 Mar, 2023
Comtek is now providing structural component repairs for the E-Jet family of airplanes
20 Dec, 2022
Every year, the team at Comtek raises funds to support local families in need through our annual Holiday Food Drive.
16 Nov, 2022
Comtek hosted senior leadership from Latecoere to celebrate the beginning of a new era following Latecoere's acquistion of Avcorp.
Show More
Share by: