Comtek Advanced Structures has developed several floor upgrade packages for the Bombardier Dash 8 Q400 aircraft.
The floor upgrade packages are available for the forward entry, aft entry and the aft upper baggage bay. Due to high levels of traffic and stress during regular use, the floor panels in these areas need to be replaced or repaired frequently.
Comtek developed floor panel upgrades using more robust materials such as heavy duty honeycomb core to increase stiffness and durability and a mat overlay to reduce surface wear and increase impact resistance. These upgrades will give operators an increased operational life on each of the panels by improving the reliability of the aircraft with respect to these areas. Each floor upgrade package comes with a 24 month warranty on materials and workmanship.
Learn more about Comtek's Q400 floor panels.
Comtek designs, manufactures and repairs aircraft components with a focus on improved durability and shorter lead times. Using advanced out-of-autoclave technologies, we develop composite solutions that reduce part weight, lower total costs, and shorten production cycles.